Citra Palu Minerals (CPM) has Contract of Work rights to a 85,180 hectare mining concession in Central Sulawesi and South Sulawesi, Indonesia.
The company currently operates two gold mines with the third being a heap leach operation.
Como Engineers are currently pre commissioning a 2T Pressure Zadra plant at our workshop premises located in Maddington, Western Australia. It will subsequently be dismantled and then placed in sea containers for delivery to the Citra Palu site located in Sulawesi.
After arriving, Como Engineers will dispatch a commissioning crew who will supervise the installaiton and commissionoing of the plant onsite.
Como Engineers is also currently fabricating a 6T Pressure Zadra Gold Elution plant for another Indonesian client. This will be couled with a Carbon In Column (CIC) circuit which is being constructed in parallel by our sister company in Indonesia PT Como Engineers.
Busy times for the company.