Darlot Gold Mine Structural Capacity of Existing CIL Tank Platforms
2012
Northern Goldfields, Western Australia
Como Engineers were engaged to investigate the capacity of the existing CIL Tank Platforms to carry additional loading from new agitators. The new loadings were higher than previous loads and the structures had deteriorated through corrosion.
Como undertook the following Structural Engineering work:
- Inspection of the existing platforms to determine the existing members and their condition
- Modelling of the existing structures and the new loadings from the additional machines
- Specification of additional supports and bracing members, and determination of load limits to surrounding platforms
- Inspection and certification of the completed works