News List
Boorara Gold Project
Como Engineers were engaged to undertake a Pre Feasibility (PFS) and Definitive Feasibility Study (DFS) for the process design of a 1.5 Mtpa gold process plant and associated infrastructure. The feasibility study scope of work included the following: Undertake Gap Analysis on metallurgical testwork, looking at different ore types and lithologies; Generate a Design Criteria […]