Como Engineers have worked tirelessly to perfect the modular design of operating plant and equipment.
Modular design can allow clients to minimise on-site disruptions to a site through the use of pre-built and pre-commissioned sections of plant. Construction and commissioning times are reduced to a minimum for the client which significantly reduces costs and allows the fastest path to positive operational cashflow. Any issues of remote or troublesome geo-political locations is minimised by reducing the need for large construction crews on site for considerable periods of time.
Como Engineers Modular Elution Plants are completely constructed in our workshop in Perth, fully water tested to temperature and client witnessed. Once complete, the plants are disassembled into modules, packed into sea containers for export and shipped to site.
Site Installation for Modular Elution & Carbon Regeneration Systems is a matter of weeks not months. Smaller systems less than 4 tonnes capacity takes only 2-3 weeks; our 10 tonne Modular Plant takes only 6 weeks from opening the sea container doors on site to it being ready for commissioning with carbon.